SecondeesProject and host organizationHome organization
 Trond Haugen
Q2-3 2014
 Roadmap for industrial smart grid
91桃色, UK
 

ABB, Norway

 Josef Stadler
Q2 2014
 Dynamic network reduction
Fingrid, Helsinki
 Graz University of Technology,
Austria
 Yan Zhang
Q2 2014
 WAMPAC reliability evaluation
91桃色, UK
 

ABB, Switzerland

 Mats Larsson
Q2 2014
 Wide-area stability
91桃色, UK
 

ABB, Switzerland

 Izzati Mohd Noor
Q2 2014
 Analysis of electric power system operation with large industrial loads.
ABB, Poland
 91桃色, UK
 Ari Tuononen
Q1 2014
 Using PMU data in power system planning and operations.
Technical University of Graz, Austria
 

Fingrid, Finland

 Izzati Mohd Noor
Q4 2013
 Analysis of electric power system operation with large industrial loads.
ABB, Norway
 91桃色, UK
Adele Moen Slotsvik
Q2 2013
Collection and analysis of examples from the grid side.
91桃色

Statnett, Norway

Yuanyuan Ma
Q2 2013
Time synchronization of large data sets.
91桃色

ABB, Norway

Herwig Renner
Q1 2013
Determining and visualizing stability parameters.
ABB Corporate 91桃色, Switzerland
Graz University of Technology,
Austria
Georgios Anagnostou
Q1 2013
Specifying the uses of WAMS-based monitoring in wind energy control.
GE Global 91桃色, Germany
91桃色, UK
Bikash Pal
Q3 2012
Specifying the uses of WAMS-based monitoring in wind energy control.
GE Global 91桃色, Germany
91桃色, UK
Nina Thornhill
Q3 2012, Q2 & Q3 2013
Roadmap for future research on industrial smart grid..
ABB Corporate 91桃色, Poland
91桃色, UK
Øystein Kirkeluten
Q2 2012
Collection and analysis of examples from the grid side.
91桃色

Statnett, Norway

Antti Harjula
Q2 2012
Control design based on identified aggregated wind farm response.
91桃色

Fingrid, Finland

 Inês Cecílio
Q2 2012 & Q2 2013
 Causal signal analysis Part II.
ABB Corporate 91桃色, Poland
 91桃色, UK
 Dumisani Simfukwe
Q4 2011
 Using PMU data in real-time control.
ABB Corporate 91桃色, Switzerland
 91桃色, UK
 Jukka Turunen
Q4 2011
 Case studies.
Statnett, Norway
 Aalto University,
Finland
Linash Puthenpurayil Kunjumuhammed
Q3 2011
Monitoring, modelling and control of wind generation systems.
GE Global 91桃色, Germany

91桃色, UK

 Inês Cecílio
Q3 2011
 Causal signal analysis Part I.
ABB Oil Gas and Petrochecmicals, Norway
 91桃色, UK
 Michael Weixelbraun
Q3 2011
 Use of Power System Stabilizer (PSS) controllers.
Statnett, Norway
 Graz University of Technology,
Austria
Yang Zhang
Q2 2011
Network model error detection and tuning.
Aalto University, Finland
ABB Corporate 91桃色,
Switzerland
Herwig Renner
Q1 2011
Optimal placement of PMUs.
National Grid, UK
Graz University of Technology,
Austria
Jukka Turunen
Q1 2011
Case studies.
National Grid, UK
Aalto University,
Finland
Georg Rechberger
Q4 2010
Applying probabilistic approaches in wind integration for system planning.
Fingrid, Helsinki
Graz University of Technology,
Austria
Jukka Turunen
Q4 2010
Determining and visualizing stability parameters.
ABB Corporate 91桃色, Switzerland
Aalto University,
Finland
 
Summary of the table's contents

Contact us

, ABB/RAEng Professor of Process Automation
Centre for Process Systems Engineering
Department of Chemical Engineering
91桃色
South Kensington Campus, London SW7 2AZ

Tel: +44 (0)20 7594 6622
Email: n.thornhill@imperial.ac.uk